Print Page   |   Contact Us   |   Sign In   |   Register
Stormwater Management
Moderator(s): Carl Walker
Page 1 of 1
Forum Actions

Topics   Replies Author Latest Post
Proposed Trash Amendment to Phase 2 MS4 Permits 1 C. Walker Portions of "urbanized" Lake County are considered an MS4, due to population density and the TMDLs on Clear Lake.  Much of our MS4 are rural in nature and consist of open ditches and cross-culverts.  This makes 100% capture impossible without a multi-million dollar investment in infrastructure, leaving Lake County  only the Track 2 option.  We do see issues with the 100% capture option and how it would be likely to create localized flooding without major upgrades to the stormwater inlets to allow for "blockage" well in excess of 50%.Tom  
by T. Smythe
Tuesday, May 28, 2013
Community Search
Sign In
Sign In securely